File #: 15-624    Version: 1 Name:
Type: Agreement Status: Passed
File created: 6/8/2015 In control: Parks & Recreation Committee
On agenda: Final action: 6/15/2015
Title: Agreement with Port-a-Pier to furnish labor, equipment and material required to build a new 6' x 10' port-a-pier shore mount with a 6' wide and 16" long wheelchair access plate secured on the Schuette Park shoreline connected to a modified existing 6' x 30' gangway with hand railings at a cost of $15,011.00.
Attachments: 1. 15-624.pdf
Title
Agreement with Port-a-Pier to furnish labor, equipment and material required to build a new 6' x 10' port-a-pier shore mount with a 6' wide and 16" long wheelchair access plate secured on the Schuette Park shoreline connected to a modified existing 6' x 30' gangway with hand railings at a cost of $15,011.00.